Steering group meeting

Meeting Agenda

Time: Friday, September 18, 2009 at 9.30-11.30 am
Meeting room: 7327 Serveri, CSC

Participants:

Antti Arppe  
Jussi Piitulainen  
Totti Mäkelä chair
Satu Torikka project manager, secretary

Meeting minutes

  • Project status
    • Project Plan update to version 1.1. on June 17th was approved (Project plan)
    • Project manager presented the Current project status (MS Project), Current project status (PDF) (the original project schedule is visible below the current project status)
    • Human resources used: 8,75 months of 12 months
    • Due to the delay, CSC will send Antti Arppe and Jussi Piitulainen a description of the delay and its reasoning by the next Steering group meeting.

  • Next meetings
    • Steering group meeting will be held on Monday, November 2nd at 1 pm at the University of Helsinki, Metsätalo

  • AOB
    • Antti Arppe informed that the billing for the Kalle project should be done by the end of 2009. CSC/Totti wrote: Periods 1 and 2 were billed on June 18th and Sept. 7th. The last periods 3 and 4 will be both billed on November 30th.
    • The next technical meeting will be held when the the demo for controlled authorization is ready. (The original goal to complete the demo by the Neeri event was not met.)
    • Free discussions with CLARIN Peter Wittenburg, Daan Broeder and Dieter van Uytvanck etc. when they come to Finland to the Neeri meeting.