Project kick-off meeting

Line: 39 to 39
 
  • Overall timetable will be included in the project plan. Timetable will be based on the contract. Invoicing requirements of UHEL will be filled by CSC.
  • A general project plan will be devised on the basis of the Requirements Specification. In the first place, the system can be used for the Finnish organisations participating in FIN-CLARIN. CSC will generate a draft for the project plan to be accepted by Antti Arppe, UHEL.
  • Meetings:
Changed:
<
<
    • Steering group meetings every 3-4 months (Steering group and project group as necessary). Next meeting to accept the project plan by the end of May, suggested 4th of May in the afternoon at the University of Helsinki (UHEL)
>
>
    • Steering group meetings every 3-4 months (Steering group and project group as necessary). Next meeting to accept the project plan in the early May, suggested 4th of May in the afternoon at the University of Helsinki (UHEL)
 
    • Technical meetings (project group and Antti Arppe) approximately once a month. Next technical meeting to discuss the project plan based on the Requirements Specification will be held by the end of April, preferably 27th of April (or 28th or 29th).

4. Requirements Specification

 